Large-scale industrial project for future-proof communications

This industrial project involves the installation, termination and cross-connection of approximately 42,000 fibre connections, distributed across all buildings within the first phase of the project.

We are currently working to ensure that all fibre connections are terminated and tested to the highest industry standards to achieve a robust and future-proof network infrastructure. The project proceeded and included:

  • Project management where we lead and coordinate all aspects of the project, including planning, resource allocation and ongoing monitoring to ensure we meet deadlines and quality requirements.
  • Our team performs precision fibre splicing to minimise signal loss and ensure optimal network performance.
  • We install fibre cables using cable blowing technology for efficient and gentle placement of fibre in prepared ducting systems.
  • We implement cross-connections to ensure stable and reliable connections between different buildings and network elements.
  • We will carry out final measurements to verify that all fibre connections meet the specified requirements and ensure that the network works as intended.

Project facts

LocationSkellefteå, Northvolt

ClientEitech

Finalisation2024